Apprenticeship Technical Training · Year 1 to Year 4
Mobile Crane Operator (339A) Level 1, 2, 3 & 4 Apprentice Exam Practice
Studying for your Mobile Crane Operator (339A) BC Standard Level Exam (SLE), Alberta AIT Period exam, or college block test? Review the official RSOS Major Work Activities below and test yourself on 6 free worked questions from our 1,100-question bank.
How This Resource Fits Your School Level:
Provincial level exams (BC SkilledTradesBC SLEs, Alberta AIT Period exams, and Ontario/Prairie/Atlantic college block tests) draw from progressive sections of the national Red Seal Occupational Standard (RSOS). Red Seal Pass is an independent RSOS-mapped platform (1,100 Mobile Crane Operator (339A) questions total). Use the official Major Work Activity (MWA) table below to see which blocks match your current class syllabus — and on the 6-Month Pass, use Practice by Block to drill 18-question sets in just the MWA block you are studying right now.
1. Mobile Crane Operator (339A) RSOS Major Work Activities (Blocks Tested Across Years 1–4)
Your in-school levels cover these blocks in an order your province sets (the Red Seal harmonization initiative aligns that order for many trades). The final 110-question Red Seal exam draws on all of them, in these proportions:
Block
RSOS Major Work Activity (MWA)
Final Exam Weight
Questions on IPSE
Block A
MWA A: Performs common occupational skills
6.4%
7 Qs
Block B
MWA B: Performs hoisting calculations
18.2%
20 Qs
Block C
MWA C: Inspects and maintains crane
12.7%
14 Qs
Block D
MWA D: Performs rigging
11.8%
13 Qs
Block E
MWA E: Plans lift, prepares site and sets up crane
14.5%
16 Qs
Block F
MWA F: Assembles, disassembles and transports crane
13.6%
15 Qs
Block G
MWA G: Operates crane
22.7%
25 Qs
Complete Interprovincial Red Seal Exam (Final Level)
100%
110 Qs (70% Pass)
2. Free 6-Question Mobile Crane Operator (339A) RSOS Block Check
These 6 scenario questions are separate from the 10-question quiz on our main Mobile Crane Operator (339A) Red Seal page, giving you extra free practice across different Major Work Activities. Click any choice (A–D) to check your answer:
Block Practice 1 of 6 · MWA B
While rigging an irregular steel casting at a foundry in Welland, an apprentice compares a tight choke angle of 40 degrees with a wide choke angle of 130 degrees on the same wire rope sling. The sling maker's chart has a choke angle table. How do the two choker setups compare in capacity?
A) Both setups have the same capacity, since the choker rating on the tag covers every possible choke angle
B) The tight 40 degree choke has much less capacity than the wide one, and its sharp bend damages the rope
C) The tight 40 degree choke has more capacity than the wide one, since it grips the casting much harder
D) The choke angle only changes the capacity of synthetic slings, so this wire rope sling is not affected
Correct answer: B
Below 120 degrees, a choker's capacity is reduced according to the choke angle table, and at 30 to 59 degrees it drops to about 62 percent of the choker rating. The sharp bend at a tight choke also damages the rope. The tag rating does not cover every angle, a tighter choke does not add capacity, and the choke angle matters for wire rope too.
Block Practice 2 of 6 · MWA C
A rental crane arrives in Sarnia with paperwork for a turntable and a set of outrigger beams, and the site rules say that non-destructive testing of certain components must be current. The operator cannot find any NDT record for the turntable bolts, though they look fine. What should the operator do?
A) Accept it because the bolts look fine, since non-destructive tests only confirm what is seen
B) Do a magnetic particle test in the field, since a crane operator is qualified to carry that out
C) Ask for the NDT record and verify that it is current, and hold the crane until it is produced
D) Assume it was done, since a rental company would not send out a crane that has not been tested
Correct answer: C
The operator verifies that the required non-destructive testing has been done, by seeing the record. NDT finds what cannot be seen, so looks do not replace it, testing is done by qualified technicians, and an assumption about the rental company is not a record.
Block Practice 3 of 6 · MWA D
During a pre-lift check in Barrie, a rigger finds a hook on a chain sling with its throat spread and a latch that does not close. The chain itself is sound. The lift can wait, and a rated spare hook is in the shop. What should happen to the sling for now?
A) Use it for the lift and hold the sling in the hook, since the chain itself is still sound
B) Hammer the hook back into shape and use it for the lift, since the steel is forged
C) Use it with the hook point turned away from the load, so the spread throat cannot slip off
D) Take it out of service until the damaged hook is replaced by a qualified person
Correct answer: D
A spread hook or a failed latch takes the sling out of service until a qualified person replaces the hook. Holding it by hand is not a latch, hammering damages forged steel, and turning the point does not restore the throat.
Block Practice 4 of 6 · MWA E
Before a lift that will lower a mechanical unit into a deep shaft from a tall building's roof in Toronto, the lift planner checks the hoist rope on the drum. The hook must travel a long way between the lowest and highest points. What must be confirmed about the rope?
A) That it reaches the lowest point needed with the minimum wraps still on the drum
B) That it reaches the lowest point, even if no wraps are left on the drum at all
C) That it is shorter than the boom, so it cannot reach the boom head sheaves
D) That it will be cut to length for each lift and re-clipped back onto the drum
Correct answer: A
The rope must be long enough for the lowest hook position while still leaving at least the minimum wraps on the drum, and not fewer than two. Otherwise the drum anchor would carry the load. No wraps leaves the anchor holding the load, a rope shorter than the boom cannot work, and cutting it each lift is not how it is set up.
Block Practice 5 of 6 · MWA F
To reach the top of a new distillation tower at a plant near Sarnia, the crew adds two 6 m sections to the crane's luffing jib while it lies on blocking in the laydown area. A rigger asks whether the existing pendants can stay as they are. What must be done with the jib's pendants?
A) Replace the pendants with web slings wrapped around the boom head
B) Stretch the existing pendants with a chain hoist until they reach the tip
C) Remove the pendants, so the jib's lower chords carry the load on their own
D) Add pendant sections that match the length of the added jib sections
Correct answer: D
When jib sections are added, matching pendant sections or links are added as the manual specifies, so the suspension geometry and the load on each part stay correct. Web slings, stretching pendants or no pendants at all do not match the added length.
Block Practice 6 of 6 · MWA G
On a busy foundation job in Winnipeg, the foreman asks the operator of a lattice crawler crane to put the hoist in free-fall and lower steel beams on the foot brake to speed up the cycles. The crane's manual has a section on free-fall. When is free-fall lowering normally allowed?
A) Whenever precast panels are being set into tight pockets in a wall
B) Only where the manual allows, and not for steel or people
C) Whenever steel beams are being set, since the brake gives finer control
D) Whenever loads over 10 tonnes are being lowered, to save on the motor
Correct answer: B
Free-fall lowering depends only on the operator's braking. It is used only where the manual permits, typically duty-cycle work such as clamshell or piling, and not for structural lifts or for lifting people. Pockets, steel and heavy loads are not the cases where it is allowed.
Want 10 More Free Mobile Crane Operator (339A) Questions + Worked Code Math?
Continue with our main 10-question diagnostic quiz and worked calculation reference table, or download the printable 30-question sample PDF:
Drill by RSOS Block or Cram for Next Week’s Sitting
Unlock All 1,100 Mobile Crane Operator (339A) Questions
Need a quick benchmark? Try a 1-Mock Exam Ticket ($19.99 CAD) or the Monthly Pass ($39.99 CAD/mo). Want Practice by Block, unlimited timed mock exams, Study Notes PDF, 7-Day Money-Back Guarantee, and Free-Until-You-Pass Guarantee? Choose the 6-Month Pass ($89.99 CAD).
Frequently Asked Questions — Mobile Crane Operator (339A) Apprentice Exams
What passing score is required on Mobile Crane Operator (339A) level and Red Seal exams?
The final 110-question Interprovincial Red Seal exam requires 70%. Alberta’s period exams also require 70% (for classroom instruction started on or after August 1, 2023). In BC, a Standard Level Exam usually counts for 20% of your level mark, and you need a 70% technical training result. Other provinces set their own level rules.
Which topics are covered across Mobile Crane Operator (339A) technical training?
Across their training levels, Mobile Crane Operator (339A) apprentices study load charts, rigging calculations, crane setup, outrigger soil bearing pressure, boom assembly, CSA Z150 safety code, and lift planning, aligned to the 7 Major Work Activities in the national RSOS.
Where can I check compulsory certification rules for Mobile Crane Operator (339A) in my province?