How This Resource Fits Your School Level:
Provincial level exams (BC SkilledTradesBC SLEs, Alberta AIT Period exams, and Ontario/Prairie/Atlantic college block tests) draw from progressive sections of the national Red Seal Occupational Standard (RSOS). Red Seal Pass is an independent RSOS-mapped platform (1,250 Refrigeration & AC Mechanic (313A) questions total). Use the official Major Work Activity (MWA) table below to see which blocks match your current class syllabus — and on the 6-Month Pass, use Practice by Block to drill 18-question sets in just the MWA block you are studying right now.
1. Refrigeration & AC Mechanic (313A) RSOS Major Work Activities (Blocks Tested Across Years 1–4)
Your in-school levels cover these blocks in an order your province sets (the Red Seal harmonization initiative aligns that order for many trades). The final 125-question Red Seal exam draws on all of them, in these proportions:
| Block |
RSOS Major Work Activity (MWA) |
Final Exam Weight |
Questions on IPSE |
| Block A |
MWA A: Performs common occupational skills |
10.4% |
13 Qs |
| Block B |
MWA B: Performs routine trade activities |
15.2% |
19 Qs |
| Block C |
MWA C: Plans installation |
14.4% |
18 Qs |
| Block D |
MWA D: Performs installation |
20.8% |
26 Qs |
| Block E |
MWA E: Performs commissioning |
16.8% |
21 Qs |
| Block F |
MWA F: Performs maintenance and service |
22.4% |
28 Qs |
| Complete Interprovincial Red Seal Exam (Final Level) |
100% |
125 Qs (70% Pass) |
2. Free 6-Question Refrigeration & AC Mechanic (313A) RSOS Block Check
These 6 scenario questions are separate from the 10-question quiz on our main Refrigeration & AC Mechanic (313A) Red Seal page, giving you extra free practice across different Major Work Activities. Click any choice (A–D) to check your answer:
Block Practice 1 of 6 · MWA A
A mechanic in Moncton finds a personal lock on the disconnect of a rooftop unit that needs urgent service at a nursing home. The tag shows a coworker who went home sick hours ago, still holding the key. The supervisor is on the phone, and the facility manager wants the unit running before nightfall. How may the lock be removed?
A) By cutting it off right away, with the supervisor told by phone
B) By the facility manager, who has authority over the building
C) Only under the employer's lock removal procedure, with its checks
D) By any journeyperson on site, with the tag kept and returned later
Correct answer: C
A personal lock is removed by the person who applied it. If they are unavailable, the employer's written procedure applies: confirming the worker is not on site, trying to contact them, checking that the equipment is safe, and having the authorized person remove it and tell the worker before they return. Cutting it off after a phone call, the facility manager's authority and any journeyperson on site all skip those checks.
Block Practice 2 of 6 · MWA B
Inside a rooftop make-up air unit's junction box in Lethbridge, an apprentice is splicing two 18 AWG solid copper thermostat wires to extend a sensor circuit. The apprentice twisted the insulated jackets together and screwed a large wire connector on loosely, leaving copper showing below it. How should a twist-on connector be used?
A) Strip the ends, pick the largest connector in the kit, and twist it on finger-tight with no copper showing
B) Leave the jackets on, twist them together by hand, and thread the connector on finger-tight over them
C) Strip the ends, pick a connector sized for the wires, and leave about ten millimetres of copper showing
D) Strip the ends, pick a connector sized for the wires, and twist it on tight with no copper showing
Correct answer: D
A twist-on connector must be listed for the number and size of wires, twisted on firmly over properly stripped conductors, and must cover all bare copper. Loose connectors and exposed copper cause intermittent faults and shorts to the enclosure.
Block Practice 3 of 6 · MWA C
During hydronic balancing at a Winnipeg hospital, a mechanic checks a 20-ton chilled water coil that must remove 240,000 BTU/h with the water warming from 44°F to 54°F. Using flow = BTU/h divided by (500 x temperature rise), what water flow does the coil need?
A) 48 US gpm
B) 24 US gpm
C) 96 US gpm
D) 60 US gpm
Correct answer: A
Flow = 240,000 / (500 x 10) = 240,000 / 5,000 = 48 US gpm. 24 US gpm uses a 20°F rise, 96 US gpm uses a 5°F rise, and 60 US gpm uses an 8°F rise. The factor 500 comes from 8.33 lb/gal x 60 min/h x 1 BTU/lb-°F.
Block Practice 4 of 6 · MWA D
A new air-cooled condensing unit with an R-410A holding charge is delivered to a Saskatoon site in January and will be stored outdoors for several weeks, with temperatures between -35°C and 0°C. What is the main concern for the holding charge during this storage?
A) That the snow is kept clear of the service valves, so they can still be opened by hand on install day
B) That its pressure stays above atmospheric in the cold, so air and moisture cannot be drawn into the coil
C) That a little of the holding charge is released each week, so its pressure stays equal with the air outside
D) That the compressor's crankcase heater is powered all the time, so oil cannot migrate during the storage
Correct answer: B
A holding charge's pressure follows its temperature, so it falls in severe cold. If it drops to atmospheric or below, any small leak can draw in air and moisture. The pressure is checked, and the unit is inspected before installation. Snow on the valves is a minor matter, releasing charge weekly lets air in, and a crankcase heater is not powered in storage.
Block Practice 5 of 6 · MWA E
During commissioning of a new ceiling-hung fan coil above a finished office in Toronto, the mechanic wants to prove the condensate drain works before the ceiling tiles go back. The unit has not yet run long enough to make much condensate. How can the drain be proven?
A) Pour water into the drain pan and watch it drain freely through the trap
B) Wait for the first leak through the ceiling, which proves where the drain is
C) Blow compressed air into the drain outlet to check that the line is open
D) Assume it works, since the drain line was sloped when it was installed
Correct answer: A
Pouring water into the pan proves the pan, trap and line drain freely and shows any leaks at the joints, before the ceiling closes. Compressed air can blow apart PVC joints or the trap. Waiting for a leak damages the ceiling, and assuming it works proves nothing.
Block Practice 6 of 6 · MWA F
A walk-in cooler at a Kelowna winery holds 2°C and has an electric defrost evaporator. The mechanic is setting the adjustable defrost termination thermostat clamped to the coil. The setting must be warm enough to clear all the frost but not so warm that defrost wastes heat into the box. What is the usual setting?
A) About 25°C
B) About -5°C
C) About 10°C
D) About 2°C
Correct answer: C
Defrost is normally ended when the coil reaches about 10 to 13°C, which shows the frost is gone. About -5°C is below the box temperature and about 2°C is the box temperature, so both end defrost before the frost is gone, and 25°C would add heat and steam to the box.
Drill by RSOS Block or Cram for Next Week’s Sitting
Unlock All 1,250 Refrigeration & AC Mechanic (313A) Questions
Need a quick benchmark? Try a 1-Mock Exam Ticket ($19.99 CAD) or the Monthly Pass ($39.99 CAD/mo). Want Practice by Block, unlimited timed mock exams, Study Notes PDF, 7-Day Money-Back Guarantee, and Free-Until-You-Pass Guarantee? Choose the 6-Month Pass ($89.99 CAD).
Frequently Asked Questions — Refrigeration & AC Mechanic (313A) Apprentice Exams
What passing score is required on Refrigeration & AC Mechanic (313A) level and Red Seal exams?
The final 125-question Interprovincial Red Seal exam requires 70%. Alberta’s period exams also require 70% (for classroom instruction started on or after August 1, 2023). In BC, a Standard Level Exam usually counts for 20% of your level mark, and you need a 70% technical training result. Other provinces set their own level rules.
Which topics are covered across Refrigeration & AC Mechanic (313A) technical training?
Across their training levels, Refrigeration & AC Mechanic (313A) apprentices study refrigeration cycles, heat pumps, psychrometrics, compressors and evaporators, controls, and CSA B52 safety code, aligned to the 6 Major Work Activities in the national RSOS.
Where can I check compulsory certification rules for Refrigeration & AC Mechanic (313A) in my province?
See our provincial breakdowns for Refrigeration & AC Mechanic (313A) in BC, Refrigeration & AC Mechanic (313A) in Ontario, and Refrigeration & AC Mechanic (313A) in Alberta, or read our Canadian Red Seal Challenge (Trade Qualifier) Guide.